Gascoyne Resources

Dalgaranga


The combined Measured & Indicated resource for the Dalgaranga Project stands at 23.0Mt @ 1.4g/t Au for 1,019,000 ounces of contained gold.

Dalgaranga Deposits

Mineral Resource Estimate

 

Measured

Indicated

Inferred

Total

Type

tonnes

Au

Au

tonnes

Au

Au

tonnes

Au

Au

tonnes

Au

Au

 

Mt

g/t

Ounces

Mt

g/t

Ounces

Mt

g/t

Ounces

Mt

g/t

Ounces

Laterite

 

 

 

0.2

1.7

13,000

 

 

 

0.3

1.6

13,000

Oxide

0.4

1.8

20,000

0.7

1.8

42,000

0.3

2.1

19,000

1.4

1.8

80,000

Transitional

0.3

1.8

14,000

0.5

1.6

25,000

0.2

1.5

10,000

0.9

1.6

49,000

Fresh

1.8

1.3

74,000

7.5

1.3

322,000

11.1

1.3

481,000

20.4

1.3

877,000

Total

2.4

1.4

108,000

9.0

1.4

401,000

11.6

1.4

509,000

23.0

1.4

1,019,000

Note: Totals may differ due to rounding, Mineral Resources reported on a dry basis Gilbeys Resource – October 2015 (0.5g/t above 120RL and 1.0g/t cut-off below) and Golden Wings Resource June 2015 (1.0 g/t cut-off)